Soil testing planned on I-20/59 near I-65 interchange

Road Construction

BIRMINGHAM, Ala. (WIAT) – Delays can be expected on I-20/59 near the I-65 interchange.

Parts of the shoulder will be closed from 9 a.m. to 3:30 p.m. each day.

The Alabama Department of Transportation will conduct the testing behind the guardrails.

The testing is part of ALDOT’s plan to replace the elevated road, which is still in the design phase.

Copyright 2013 WIAT-TV CBS 42

blog comments powered by Disqus